FILE – In this June 8, 2017, file photo, fresh nuts, bolts and fittings are ready to be added to the east leg of the pipeline near St. Ignace, Mich., as Enbridge prepares to test the east and west sides of the Line 5 pipeline under the Straits of Mackinac in Mackinaw City, Mich. The 65-year-old pipeline that carries crude oil beneath the sensitive waterway connecting two of the Great Lakes could be replaced with pipes buried in a tunnel or partially enclosed in trenches that would pose virtually no risk of leakage but require years and hundreds of millions of dollars to build, says a report released Friday June 15, 2018. (Dale G Young/Detroit News via AP) TRAVERSE CITY, Mich. (AP) — Michigan’s environmental agency said Friday it has approved construction of an underground tunnel to house a replacement for a controversial oil pipeline in a channel linking two of the Great Lakes. The decision, a victory for Enbridge Inc., comes as the Canadian company resists Democratic Gov. Gretchen Whitmer’s demand to shut down its 68-year-old line in the Straits of Mackinac. Enbridge disputes her claim — echoed by environmentalists and native tribes — that the pipeline segment […]
CamTrader offers a preview only. View original article. www.ironmountaindailynews.com